Testimonials

Testimonials

“Hunters excel on the quality of their project delivery and understand the issues around working on ‘live’ sites.”
Veolia, UK Operations Manager 

■  ■  ■

"Hunter brought an expertise and skill not matched by other IT integrators, or any M&E Contractors, as the Campus of two sites, brought challenges installing in Executive offices, Production and Research Labs. The site brought many challenges all over come by Hunter and their operatives."
A System Designer

■  ■  ■

“Most pleased to be used as a reference on Hunters web site and be associated with Hunters work, following twenty years of working with them on multiple sites for Pharmaceuticals in the South of England, I would recommend.”
Graham Clarke FHP Engineering Director

■  ■  ■

“Always approachable and work in and around active production areas, efficient and accommodating to all our needs for both M&E and office builds, I always use Hunters.”
Bradley Fisher European Vision Care Sunbury

■  ■  ■

"I have worked with Hunters in challenging circumstances and demanding environments, they never let me down.”
Andy Andrews J&J High Wycombe Facilities Manager

■  ■  ■

"I always consult with Hunter about challenges and bringing the job together a committed group of Trades and Professionals, I have no hesitation in recommending them to clients and friends.”
Martin Lee Engineering Consultant/senior Project Manager

■  ■  ■

"Hunter designed and installed a camera and door access system to the value of £750K at Moreton on the Wirral. The system required managing a C-Cure Specialist as USA Corporate Systems had to be applied. The infrastructure was single mode OS1 fibre and Cat6A cabling with extensive POe switches throughout the site.

A difficult job as the site continued working throughout and access and the installation, was carried out as not to disturb the key Pharmaceutical Production business, this they did very well. Completed within Programme and Budget expectations. Dealing with an overseas IT team proved challenging, but Hunter was great throughout.

Hunter exhibited a flexibility and responsiveness to the project requirements and great to deal from day to day, I have no issue recommending them to other Pharmaceuticals.”
Andy Butler BMS Project Management

■  ■  ■

"The construction of the CBA lab was not without difficulties and additional challenges. However, the flexibility and ability of overcoming these obstacles was outstanding by the contractor team. Due to great onsite support, activities were scheduled to meet the agreed timeframes within the given constraints. The implementation of the project proceeded in a safe manner, the delivery was to the expected high quality, additional input on changes have been appreciated.

Communication throughout the project was very good, with weekly progress reports and meetings being very helpful.”
Pharmaceutical Project Manager

■  ■  ■

"A $2.7M project. Working from a dis-used (1950's) building on site at Innospec Ellesmere Port Cheshire Hunter Projects refurbished the building providing a state-of-the-art Laboratory and Office suite.

Designed and Constructed during COVID 19 Hunter delivered a high quality finished set of laboratories to match any in the UK. Taken from a derelict building to a state-of-the-art Laboratory with technically demanding extraction systems.

A significant feature is that the design was carried out alongside the Construction tasks. A well-managed and controlled installation, delivered in demanding circumstances with zero H&S issues. A complete overhaul of the building and finishes was carried out. The latest fume cupboard design and extraction was devised and installed alongside Ventilation ducts served via an AHU all within limited headspace. A true Turnkey Project!”
Mike Wood Principal Corporate Process Engineer

■  ■  ■

Share by: